• Our USPP Store
  • Services
  • Advertise
  • About
    • About Military Africa
    • Our Amazing Team
    • Contact
    • Policies
      • Retraction and Correction policy and fee
      • Responsible Use of Artificial Intelligence (AI) Policy Document
      • Disclaimer
      • Cookies Policy
      • Terms and Conditions
      • Refund Policy for Military Africa
      • Privacy Policy
      • Advertising Policies
  • SUPPORT MILITARY AFRICA
Military Africa
  • Domains
    • Aerospace
    • Land
    • Naval
    • Industry
    • Security
    • Unmanned systems
    • Technology
    • Training and Simulation
    • Missile & artillery Systems
  • iNSIGHTResources
  • Magazines
  • Events
  • Press Release
  • Whitepaper | Technology Reports
No Result
View All Result
  • Domains
    • Aerospace
    • Land
    • Naval
    • Industry
    • Security
    • Unmanned systems
    • Technology
    • Training and Simulation
    • Missile & artillery Systems
  • iNSIGHTResources
  • Magazines
  • Events
  • Press Release
  • Whitepaper | Technology Reports
No Result
View All Result
Military Africa
No Result
View All Result
ADVERTISEMENT
ADVERTISEMENT
Home Aerospace

US begins constructing A-29 facility in Nigeria

Ekene Lionel by Ekene Lionel
August 6, 2020 - Updated on September 6, 2020
in Aerospace
Reading Time: 3 mins read
Nigerian Air Force A-29 Super Tucano

Nigerian Air Force A-29 Super Tucano

The United States Air Force has commenced construction of the facilities needed to support Nigeria’s new A-29 Super Tucano air wing.

The contract for the construction was awarded by the US Air Force Security Assistance and Cooperation Directorate’s Foreign Military Sales Construction Division to the United States Army Corps of Engineers, Europe District, worth $36.1 million.

The new facilities will support twelve A-29 aircraft, and will include the construction of new airfield hot cargo pad, perimeter and security fencing, munitions assembly and storage, small arms storage, a flight annex wing building for simulator training, airfield lighting, and various airfield apron, parking, hangar, and entry control point improvements, says a press statement by the Air Force Life Cycle Management Center Public Affairs on 28 August.

“With this recent contract award, we are ready to be part of the modernization of Nigerian Air Force facilities and infrastructure,” said Brig. Gen. Brian Bruckbauer, director of the Air Force Security Assistance and Cooperation Directorate.

“As a member of the Nigeria A-29 FMS Program, and this being AFSAC’s first major construction project in sub-Saharan Africa, we are thrilled to be able to support the Nigerian people in advancing their defensive capabilities. We look forward to building and strengthening this strategic partnership with the Nigerian people.”

ADVERTISEMENT
ADVERTISEMENT

The 12 A-29 Super Tucano counter insurgency aircrafts are slated to be based at the Kainji Air Base located in the western state of Niger at the southern end of Kainji Lake.

When delivered, they’ll immediately commence counter-terror operations across the country.

ADVERTISEMENT

Nigeria first indicated interest in the well-proven A-29 low intensity warfare aircraft in April 2017, and in August that same year, the United States approved the country’s request for twelve aircrafts.

military.africa/2017/04/nigeria-air-force-to-get-12-a-29-super-tucano-for-600m-usd

Nigeria signed for twelve Sierra Nevada Corporation (SNC)-Embraer A-29 Super Tucano light-attack turboprops, with a contract awarded on 28 November 2018.

The first A-29 Super Tucano for the Nigerian Air Force flew in April this year with deliveries from 2021.

The US Department of Defense (DoD) awarded prime contractor Sierra Nevada Corporation (SNC) $329.08 million for the 12 aircraft, with a further $15.65 million potentially earmarked for forward-looking infrared (FLIR) sensors on six aircraft. As noted by the DoD, these FLIR systems are expected to be funded shortly.

In addition to the aircraft, the current Foreign Military Sales (FMS) contract would include ground training technologies, mission planning systems, mission debrief systems, spares, ground support equipment, alternate mission equipment, as well as US contractor support.

According to the Department of Defence, work is expected to be completed in May 2024.

So far, the first A-29 Super Tucano for the Nigerian Air Force flew in April this year with deliveries from 2021.

military.africa/2020/04/nigerias-first-super-tucano-aircraft-takes-flight-ahead-of-delivery

Moody Air Force Base in Georgia is currently training the Nigerian Air Force pilots and maintenance personnel on the Super Tucano.

Related

Tags: Nigeria
ADVERTISEMENT

EDITOR'S RECOMMENDATION

Turkish Air Defense Missile wreckage surfaces in Sudan’s drone war

DICON partners with Eagle International for Defence Systems

HAVELSAN’s FLEETSTAR Completes Factory Acceptance Tests for MİLGEM Ships 10 and 11

Uganda approves troop deployment to join US-Backed Gaza Force

ADVERTISEMENT
No Result
View All Result
  • Domains
    • Aerospace
    • Land
    • Naval
    • Industry
    • Security
    • Unmanned systems
    • Technology
    • Training and Simulation
    • Missile & artillery Systems
  • iNSIGHT
  • Magazines
  • Events
  • Press Release
  • Whitepaper | Technology Reports

© 2025 Military Africa