# LST 100: Nigerian Navy landing ship tank is almost ready

- Link: https://www.military.africa/2021/10/lst-100-nigerian-navy-landing-ship-tank-is-almost-ready/
- Published: 2021-10-01T10:00:00+01:00
- Author: Ekene Lionel

The new landing ship is being constructed for the Nigerian Navy by Damen Shipyards
is one step closer to being fully combat ready.

The landing ship tank; an LST 100 class vessel (Damen classification LST 1314) will
replace the decommissioned landing ships NNS Ambe and NNS Ofiom which were Type 
502 amphibious vessels built by Howaldtswerke-Deutsche Werft (HDW) in Germany in
1978.

Demen Shipyards [began building the LST 100 (LST 1314) towards the end of 2019](https://www.military.africa/2021/10/lst-100-nigerian-navy-landing-ship-tank-is-almost-ready/military.africa/2019/12/damen-begins-construction-of-lst-100-landing-ship-for-nigeria),
with Vice Admiral Ibok-Ete Ibas, attending the keel-laying ceremony at Damen’s shipyard
in Sharjah, United Arab Emirates (UAE).

DSNS (Damen Schelde Naval Shipbuilding) the naval shipbuilding arm of Damen shipyards
is handling the contract, [while the ship is being constructed at the Damen-Albwardi Shipbuilding Yard in Sharjar in the UAE.](https://www.military.africa/2021/10/lst-100-nigerian-navy-landing-ship-tank-is-almost-ready/military.africa/2021/06/nigerian-navy-launches-new-landing-ship-to-boost-amphibious-operations)

 military.africa/2021/06/nigerian-navy-launches-new-landing-ship-to-boost-amphibious-
operations

Damen Shipyards of the Netherlands beat Anadolu Deniz of Turkey and Indian Shipyards
GOA of India to win the bidding contract which was organized by a team from the 
Bureau of Public Procurement as well as a technical committee of the Nigerian Navy
in 2017.

ADVERTISEMENT

LST 100 (LST 1314) was supposed to be delivered at least in May 2020 but was delayed
by the restrictions caused by the covid-19 pandemic.

So far, Damen has moved the ship down the slipway into the sea for final refitting
using a heavy-duty synchro-lift. The hull and superstructure are complete and the
propellers and associated shafting are in place. However, the engines have not been
fitted.

ADVERTISEMENT

According to Demen, the LST 100 (LST 1314) would be ready for delivery by early 
next year.

ADVERTISEMENT

The LST 100 class vessel is a 100 m-long landing ship with a displacement of 1,300
tonnes, a range of 4,000 n miles, and an endurance of 15 days. It has both stern
and bow ramps, as well as a flight deck for a medium helicopter. It can carry 235
troops as well as 18 crew. Two davits for launching and recovering landing craft
and a 25-tonne cargo crane are options.

When completed, the new LST will provide essential sealift capabilities for the 
Nigerian Navy especially during periods of national emergency.

### _Related_
